Marine and underwater work for bridge foundations for the Åstfjord Bridge, client Statens Vegvesen.
Excavation of construction pit for two caissons approximately 7000m3. Underwater casting, levelling, foundations and underpours of the caissons, a total of approximately 1000m3. Assembly/sinking of two caissons with a diameter of 18.4 metres and a height of 16 metres. Backfilling, ballast filling, as well as erosion protection.
We are building the foundation for the infrastructure of the future
At Sjøentreprenøren we are proud to have completed a number of successful maritime projects that demonstrate our expertise and dedication to delivering results that meet our customers' needs.