Identification code LK6936
Type: Splitter
Load capacity: 300 m³
Length/width: 42.7 x 8.5 metres
Control: Remote control for opening and closing from tugboat
Balbinus is a modern and robust split barge developed for safe and precise handling...
Identification signal LH5047
Type: Splitter
Loading capacity: 280 m³
Length/width: 36 x 8 metres
Control: Remote control for opening and closing from tugboat
Bergfri is a solid and functional split barge, specially developed for safe and pr...
Identification signal LH5048
Type: Splitter
Load capacity: 280 m³
Length/width: 36 x 8 metres
Control: Remote control for opening and closing from tugboat
Bergmann is a powerful and functional split barge developed for the safe and controll...
Marine and underwater work for bridge foundations for the Åstfjord Bridge, client Statens Vegvesen.
Excavation of construction pit for two caissons approximately 7000m3. Underwater casting, levelling, foundations and underpours of the caissons, a total...
Environmental dredging and deepening managed by Andøy Municipality with funds from the Norwegian Coastal Administration.
Establishment of a shoreline landfill with geotextile for 15,000 m3 of contaminated sediments. Dredging and transhipment of cont...
Sjøentreprenøren AS was contracted in 2020 for dredging at Rosenberg Verft
The project was part of the preparations to receive the vessel Jotun A. The assignment consisted of dredging approximately 14,500 tonnes of contaminated loose materials and b...
The filling of 500,000 m³ of rock masses to elevation -4 metres lays the foundation for the further development of the light rail. The area will house new pedestrian and cycle paths as well as green spaces. The project was carried out with high precisio...
Otta bridge sustained damage due to the build-up of ice. The ice had moved the bridge off the western foundation and damaged the foundation. The marine contractor was a subcontractor to Øst-Riv and was tasked with preparing the construction pit for cast...
Harstad Havn KF in Troms and Finnmark county upgraded its port facility Larsneset in the centre. In front of parts of the quay front, dredging and blasting were to be carried out to achieve an appropriate depth.
The project was the first of two cont...