Vardø harbour was to deepen the area inside the western breakwater down to -3.0 metres LAT. A commercial area/quay with a height of 3.7 metres was also to be established. In this connection, a quay with a paved waterfront was to be built.
The construction of the quay and the placement of dredged material were included in the marine contractor's tasks.
A total of approximately 5,000 tfm3 was blasted and dredged
The contract form was a turnkey contract.
Dredging that allows for development
At Sjøentreprenøren, we are proud to have completed a number of successful maritime projects that demonstrate our expertise and dedication to delivering results that meet our customers' needs.




Oktober 2019 - Februar 2020

Mai 2021